Updated Protective Devices
72kva/ 150kwh
Engr. Owo taking snap with Engr. Wang
Engr. Habeeb Dancing on the roof
24kva/40kwh Lithium battery
Engrs
Engr. Otunba of BTS
Engr. Owo working with his boss Mr. lee
Group photo after successful installation of 80 panels
Engr.(Olasun,Tunde,Kozeem and Otunba)
Vest design Prototype
Engr Kozeem of BTS
100% done 11kva inverter, 15kwh Lithium battery and 7,200 watts solar Panels
BTS Logo
Engr. Owo after completion of 1kva with 12v 200ah dry cell battery
Previous Protective devices arrangement
Panel arrangement at First gate
Engr. Yusuf and Engr. Olasunkanmi